The job: a 14.2 m footbridge between two buildings, with its stairs, railings and bracing. The catch: the main beams are longer than the 12 m bars, the knee braces are cut at 35°, and the rack is already full of offcuts from earlier jobs. Here is what Kalepis did with it, section by section.
- 92.5%overall material yield
- 165parts on 43 bars
- 5.9 tof steel, net weight
- 5sections, from IPE 240 to SHS 80 × 80

Seven bars for 32 IPE 240 parts: a stock offcut first, 14.2 m beams spliced with a Z joint, knee braces nested end to end. 94.5% material yield.
One calculation per section
| Section | Yield | Parts | Bars used | Gross / net weight | Reusable offcuts |
|---|---|---|---|---|---|
| IPE 240 | 94.5% | 32 | offcut 4,350 + 6 × 12 m | 2,344 / 2,217 kg | 3.8 m |
| HEA 160 | 89.6% | 18 | offcut 5,200 + 5 × 12 m | 1,989 / 1,792 kg | 5.9 m |
| UPN 140 | 93.0% | 11 | offcut 3,100 + 3 × 6 m | 338 / 315 kg | 1.0 m |
| L 70 × 7 | 94.9% | 56 | 2 offcuts of 2,400 + 14 × 6 m | 657 / 622 kg | 3.2 m |
| SHS 80 × 80 × 4 | 90.7% | 48 | offcut 3,200 + 9 × 12 m | 1,023 / 930 kg | 9.4 m |
What this case shows
- The 14.2 m beams are longer than the 12 m bars: Kalepis splices them with a Z joint, 12,000 + 2,440.
- Knee braces cut at 35° are laid head to tail: two parts, one saw cut, 167 mm saved.
- The offcuts on the rack go first: 4,350 mm of IPE 240, 5,200 mm of HEA 160.
- Joists notched at both ends, each with its dimensioned sheet in the part list.